Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Two grouphead Flow meter cable, per two groupheads

  • Alternate pinout adapter, per two groupheads

...

Two quick connect (blade) connectors plus ground lug (Rancilio)

...

Parts required

  • Two grouphead Flow meter cable, per two groupheads

  • Two terminal plus ground lug flow meter adapter, per grouphead

...